Project Case Study

LB Tex ZLD

The Challenge

An industrial textile operation required a 1,500 KLD treatment system that could manage process effluent and reduce liquid discharge through a staged recovery approach.

What GSI Delivered
1

ETP-HRRO-ZLD treatment train configuration

2

High-recovery reverse osmosis integration for concentrate reduction

3

Industrial-scale system design for sustained wastewater compliance

The Outcome

The project establishes a 1,500 KLD industrial ZLD pathway for textile effluent management and water recovery.