Pre-design influent characterisation across 300+ parameters
Industrial Wastewater Treated to the Standard Your Licence Requires.
Industrial effluent arrives at the treatment plant with a composition specific to the process that generated it — high COD, high TDS, colour, suspended solids, heavy metals, or biological loading — and it must leave at a quality that meets SPCB discharge standards or ZLD obligations. A generic treatment configuration will not achieve this reliably.
GSI's packaged effluent treatment plants are configured to the specific effluent characterisation of each industrial process — following a full influent analysis as part of our site diligence framework before any design decision is made. Treatment typically progresses across a primary stage (physical-chemical or screening), a biological membrane stage (MBR or MBBR), and where ZLD is mandated, high-recovery RO (HRRO) followed by evaporation. Configuration is determined by effluent quality, recovery target, and applicable regulatory obligation.
Primary treatment: screening, equalisation, physico-chemical
Secondary: MBR · MBBR · ASP · UASB (anaerobic)
Tertiary: HRRO · UF · Ion Exchange · RO polishing
Tertiary: ZLD: MEE · ATFD · MVR · brine recycle and salt recovery
Zim Laboratories
OPI Ahmedabad
Mangal Textiles
LB Tex ZLD
Avadat Apparels
Maximum Recovery. Zero Liquid Discharge. Pre-integrated Design.
Walk us through your facility’s discharge obligations.
